Sponsored By
Construction of second CSSC Carnival cruise ship begins at Shanghai Waigaoqiao
The steel-cutting ceremony for China’s second CSSC Carnival cruise ship was held at Shanghai Waigaoqiao Shipbuilding today.
1 Min Read
Credit: Seatrade Cruise News
The 142,000gt vessel, measuring 341 meters/1,119 feet long and 37.2 meters/122 feet at the beam, will have 2,144 cabins with a total capacity for 5,232 passengers.
First CSSC Carnival cruise ship due in 2023
The first cruise ship built by Waigaoqiao for the CSSC Carnival joint venture has entered into the interior decoration and system adjustment phase. It is expected to be delivered in 2023.
Read more about:
Shanghai Waigaoqiao ShipbuildingAbout the Author
The latest cruise news, analysis and more straight to your inbox
Get the free newsletter read by industry experts
You May Also Like